PRO2CONTROL:
On-line control of Drawing and
Blanking Processes and of Quality of the Product by Fusion
of Sensors and Artificial Vision Techniques
The main objective of this project is to develop a complete control system to be fitted
on the ensemble press – tooling in order to assure a zero-defect in forming industries consecrated to the manufacturing of small size workparts.
The capablities of the system are:
To ensure the safety of the press and the tooling, and hence to avoid breakages and damages dues to overcharges.
To monitor the main process parameters in order to analyse and know their influence
on the quality of the product (and to find the causality relationships between the signals
given by the sensors and the quality of the part).
To detect all the non-conformities in the manufactured product, with the same analyse
speed the production facilities have (from 100 to 1.800 strokes per minute in blanking;
from 10 to 200 in drawing).
To control the system on line, by means of changes in the values of the manufacturing parameters.
PRO2CONTROL is an FP6 project funded by the European Commission
Project number: FP6-017900 Duration: 1.11.2005-31.10.2007
Coordinator: MGEP S.Coop
Loramendi Street, 4
20500, Mondragon, Guipuzkoa, Spain
Home: www.eps.mondragon.edu
E-mail: pro2control@eps.mondragon.edu
The responsibility for the content of this website is solely at the PRO2CONTROL-consortium.
Opinions expressed here do not represent the opinion of the European Community.
The Community is not responsible for any use that might be made of the data
appearing on this website.